Just pads will take me 30 minutes for the whole car, including taking the wheels off, putting them on, and torquing bolts to proper specs.
This is with a chassis lift so all four wheels are just off the ground at the same time.
|
Just pads will take me 30 minutes for the whole car, including taking the wheels off, putting them on, and torquing bolts to proper specs.
This is with a chassis lift so all four wheels are just off the ground at the same time.
« Previous Thread | Next Thread » |
Tags for this Thread |