id start with the main grounds (trans bell housing) and the ground to the body near the battery. as well as the battery terminals. make sure they are all tight, and clean.
|
id start with the main grounds (trans bell housing) and the ground to the body near the battery. as well as the battery terminals. make sure they are all tight, and clean.
« Previous Thread | Next Thread » |
Tags for this Thread |