Finalized- after debadging going to:

1) Hawk FPS brake Pads
2) Wizaired CAI
3) Tranny fluid/filer change
4) Valve covers, wires and plugs (slight upgrade on quality of plugs)
5) Headers/catback changeout (Borla)
6) 1.5 lowering kit


This should take me til mid-next summer (funds), then will go with Pully, PCM etc.

thanks toa ll who replied!

Then- Pully, PCM, plugs again